PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

024 (800x600).jpg Backfill inside the radius at the Monumental Stairs Facing East (800x600).jpg Bolting Derrick -2 Facing North (800x600).jpg Bolting Derrick -2 Facing West (800x600).jpg Compacting 2 lift along foundation walls at column line 1 from G.1-E.3 Facing North-East(800x600).jpg Compacting aroung Monumental Stair radius Facing North-West (800x600).jpg Installing Metal deck angles at Elev. 4,5 (3rd Floor) Facing South East (800x600).jpg Metal Deck angles at Elev. 4,5 (3rd Floor) Facing East (800x600).jpg Metal Deck angles at Elev. 4-Stair -2 (3rd Floor) Facing South (800x600).jpg
Previous pageNext page Compacting 2 lift along foundation walls at column line 1 from G.1-E.3 Facing North-East(800x600)
Compacting 2 lift along foundation walls at column line 1 from G.1-E.3 Facing North-East(800x600)